PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installed sprinkler heads at the 2nd floor Facing West.jpg Installed wood block at Elevator 1,2,3 Facing West.jpg Installed motorized dampers at the 4th floor Facing West.jpg Installed VAV boxes at the 4th floor Facing East.jpg VAV boxes at the 4th floor Facing South.jpg
Previous page VAV boxes at the 4th floor Facing South
VAV boxes at the 4th floor Facing South